Indoor Riding School at Hole Farm Trekking, Dudley

AC Jackson’s have recently completed the Construction of an Indoor Riding School at Hole Farm Trekking, Dudley.  This was part of the Birmingham City Council Frame Works Scheme.

Acting as a sub contractor working for Wilmot Dixons Ltd we worked closely with them and Equine Surfaces ltd to come up with a design to facilitate their requirements.

The construction period for AC Jackson’s was extremely tight and we carried out all the works on time and on budget.

The building was 30m wide by 60m long and 5.0m to eaves height; this was designed and fabricated to BS5950 industrial specification.  It consisted of a hot rolled portal frame structure, cold rolled purlins, side rails, fibre cement roof and Yorkshire boarded sides down to ground level.  The building also has two sliding doors within the perimeter as well as two steel personnel doors.

Please look on our gallery pages to view the pictures of this project and also see many more!!!


Leave a Reply